Treat electricity capacity as national infrastructure by building transmission, interconnection, clean firm power, storage, demand flexibility, and large-load cost rules together.
Verification Status
AI-researched, unverifiedLast Reviewed
Jul 6, 2026
Cited Sources
8
What is failing, what we would change, and the conclusion we are willing to defend.
The next constraint on American innovation may be electricity. EIA's 2026 outlook says U.S. electricity consumption rose an average of 2.1 percent per year over the last five years after roughly 15 years of flat demand, and projects continued growth through 2050. Data-center server energy use is one major driver. Manufacturing, electrification, housing, heat pumps, EV charging, semiconductor fabs, and advanced computing all point in the same direction: capacity matters again.
The Innovation Party's position is energy abundance with accountability. Build more power, build the grid that moves it, connect projects faster, use clean firm generation and storage, and make large new loads pay for the grid upgrades and clean supply they require. Abundance that hides emissions or shifts costs onto households is not a serious innovation policy.
Treat long-term regional transmission planning as core economic infrastructure. FERC Order Nos. 1920, 1920-A, and 1920-B should be implemented with clear scenario planning, state engagement, cost-allocation rules, and public tracking of whether projects are actually selected and built.
Reform interconnection around speed and grid value. Queue reform should prioritize readiness, deliverability, storage, grid-enhancing technologies, and projects that solve identified reliability or congestion needs.
Require transparent large-load rules for data centers, advanced manufacturing, and other high-impact customers. New large loads should disclose demand forecasts, pay for necessary upgrades, and show how their load will be met without quietly raising household bills.
Build clean firm supply: advanced nuclear, enhanced geothermal, long-duration storage, demand flexibility, hydropower upgrades, and other low-emission resources that can help meet load when weather-dependent generation is unavailable.
Deploy grid-enhancing technologies, advanced conductors, dynamic line ratings, storage, virtual power plants, and better grid software where they add capacity faster than new lines alone.
Pair faster permitting with enforceable community notice, mitigation, and pollution compliance. Speed should mean a predictable process, not a shortcut around local harm.
The country does not have to choose between power for AI and power for households, or between climate discipline and industrial growth. It does have to plan the grid as if the economy actually depends on it.
Turn frustration into useful pressure.
If this position misses evidence or a lived consequence, challenge it. If it holds up, help test it locally and connect it to the issues around it.